Sensor commissioning micro-lab

Make a sensor signal reach the PLC.

Follow the signal from a physical target to the sensor output and finally the PLC input image.

  1. Step 1Present the target
  2. Step 2Verify the PLC input
  3. Step 3Remove the target
Live I/O bench

Proximity sensor input test

IEC 61131-3
METAL
PROX SENSOR

PLC INPUT

%I0.0 OFF
1Real control concept
3Proven operating states
0Downloads or card details