PLC Simulator
Electrical measurement trainer

Multimeter Simulator

Choose the mode, range and probe placement, then grade the measurement plan.

Run before signup Server-graded Save, share and fork
Open the workbench
industrial-lab / multimeter
MODETRAINING
GRADERSERVER AUTHORITY
EVIDENCECHECKS + SCORE

First challenge

Measure a 24 VDC control supply

Configure the meter and probes for a voltage measurement across a control supply.

Reusable lab resources

Measurement-plan templateCSV

Interactive measurement lab

Configure. Run. Read the evidence.

Foundation

Measure a 24 VDC control supply

Configure the meter and probes for a voltage measurement across a control supply.

Evidence appears here

The backend calculates the expected result and returns individual checks, a score and reproducible evidence. Client-supplied scores are ignored.

Your run is free. Keep the evidence when it matters.

Create an account only when you want saved attempts, projects, sharing and progress.

Save this result

Training outcomes

More than a calculator.

Each run teaches a transferable industrial workflow and produces evidence you can inspect, repeat and discuss.

01

Choose voltage, resistance, continuity and current modes for the job.

02

Place a voltage meter in parallel and recognise why current mode is hazardous across a supply.

03

Apply isolate, lock out and prove-dead logic before resistance or continuity tests.

04

Continue into scored electrical troubleshooting scenarios with a virtual meter.

Field method

How to reason through the lab

STEP 01

Prove the tester

Before relying on a dead reading, prove the instrument on a known source, test the target circuit, then re-prove the instrument. Follow the site procedure and equipment category limits.

STEP 02

Voltage is measured in parallel

A voltmeter compares potential between two points. Current mode has a low-resistance path and can cause a short if placed directly across a supply.

STEP 03

Continuity requires an isolated circuit

Resistance and continuity modes inject their own test signal. De-energise, isolate and prove dead before using them.

Continue from a single exercise to a complete training record.

Guided scenarios, saved progress, fault diagnosis and instructor reporting are built into the main platform.

Compare training plans

Technical practice library

Load a real job, not an empty calculator.

Each reference explains a distinct industrial task and links back to an exact grader preset with server-owned acceptance evidence.

Browse all training exercises

24 VDC control power supply

Measure a 24 VDC PLC Control Supply Safely

Choose the correct multimeter mode, probe placement, circuit state and range for a live 24 VDC control supply.

Control transformer secondary

Measure a 120 VAC Control-Transformer Secondary

Build a safe multimeter plan for a 120 VAC transformer secondary using AC voltage mode and a suitable range.

230 VAC contactor coil

Check Voltage Across a 230 VAC Contactor Coil

Plan a 230 VAC coil-voltage measurement that separates a missing command from a mechanically failed contactor.

Removed control fuse

Test an Industrial Control Fuse for Continuity

Choose isolation, prove-dead, continuity mode and across-component placement before testing a removed control fuse.

Isolated contactor coil

Measure Contactor-Coil Resistance After Isolation

Plan a de-energised resistance check across an isolated contactor coil and recognise open-circuit evidence.

4–20 mA transmitter loop

Measure 4–20 mA Loop Current in Series

Plan a controlled loop-current measurement using the fused mA input, current mode and series placement.

Three-wire proximity sensor

Check a 3-Wire Proximity Sensor’s 24 VDC Supply

Select a safe voltage measurement between the brown and blue conductors before diagnosing the sensor output.

Disconnected three-phase motor

Compare Three-Phase Motor Winding Resistance

Plan an isolated phase-to-phase resistance comparison that looks for balance rather than one universal ohm value.

Multimeter Simulator questions

What learners and instructors ask.

It is a planning and reasoning trainer with no physical voltage. It reinforces safe mode and probe choices, but practical work still requires competent supervision, rated equipment and site procedures.