PLC Simulator
Maintenance and electrical skills tests

Ramsay Test Practice: Electrical and PLC Questions

Ramsay tests are multiple-choice skills tests that employers use to hire maintenance techs and electricians. Below: what each test covers, 15 free practice questions with answers, and hands-on labs for the electrical and PLC topics.

Not affiliated with or endorsed by Ramsay Corporation. Ramsay says it does not sell test-prep material and has not approved any online practice tests. Every question here is our own original, not a real test item.

What is the Ramsay test?

Ramsay Corporation has published employment tests since 1973. Employers use them for hiring, promotion and training decisions in maintenance and craft jobs. Most Ramsay tests are multiple choice, come on paper or online, and must be taken with a live proctor.

When a job posting says “Ramsay test,” it usually means the MultiCrafTest for multi-skill maintenance roles or the ElecTest for electrical roles. The MecTest is the mechanical-only version, and some employers add a mechanical aptitude test. This page focuses on the electrical and PLC topics.

There is no published pass mark. Ramsay says each employer sets its own cut score, and Ramsay does not publish time limits for these knowledge tests.

Ramsay tests with electrical and PLC content

Summarized from Ramsay's 2026 catalog and product pages, checked 25 October 2026.

Ramsay tests with electrical or PLC content, item counts and topics
TestItemsTopics Ramsay lists
MultiCrafTest60 multiple-choiceMechanical and electrical maintenance: hydraulics and pneumatics, welding and rigging, power transmission and lubrication, pumps and piping, motors, control circuits, schematics and print reading, digital electronics, power supplies, computers and PLCs, test instruments, AC/DC theory, power distribution.
ElecTest60 multiple-choiceMotors and drives; digital and analog electronics; schematics, print reading and control circuits; AC/DC theory and electrical maintenance; computers, PLCs and test instruments; power supplies; power distribution and installation; hand and power tools.
PLC Test60 multiple-choicePLC and I/O basics, ladder logic, programming basics, peripherals and systems, troubleshooting, relays and controls.
Industrial Electrician60 multiple-choiceIndustrial electrical work with more troubleshooting than ElecTest and no board-level electronics.
Electrical Troubleshooting36 multiple-choiceAC/DC circuits, motors, schematics and print reading, computers and PLCs, construction, installation and distribution.
Maintest153 items, 2½ hoursA broad maintenance test across 21 areas, including control circuits, test instruments, and computers and PLCs.

15 free Ramsay-style practice questions

Original questions on the electrical, motor-control, meter and PLC topics that Ramsay lists. Pick your answer, then open the explanation. Each one links to a hands-on lab on the same skill.

  1. Question 1 · AC/DC theory

    A 24 V DC relay coil measures 480 ohms. About how much current does it draw?

    • A. 5 mA
    • B. 50 mA
    • C. 0.5 A
    • D. 20 A
    Show answer

    Answer: B. 50 mA

    Ohm's law: I = V / R = 24 / 480 = 0.05 A, which is 50 mA.

    Practice it: Multimeter simulator →

  2. Question 2 · AC/DC theory

    Three 100-ohm resistors are connected in parallel. What is the total resistance?

    • A. 300 ohms
    • B. 100 ohms
    • C. About 33 ohms
    • D. 0 ohms
    Show answer

    Answer: C. About 33 ohms

    Equal resistors in parallel: divide one value by the count. 100 / 3 is about 33 ohms. In series they would add to 300 ohms.

    Practice it: Multimeter simulator →

  3. Question 3 · AC/DC theory

    A 120 V heater draws 10 A. How much power does it use?

    • A. 12 W
    • B. 120 W
    • C. 1,200 W
    • D. 12,000 W
    Show answer

    Answer: C. 1,200 W

    P = V × I = 120 × 10 = 1,200 W.

    Practice it: Multimeter simulator →

  4. Question 4 · Control circuits

    In a three-wire start/stop motor circuit, what keeps the contactor energized after the start button is released?

    • A. The overload relay contact
    • B. A normally open auxiliary contact of the contactor, wired in parallel with the start button
    • C. The stop button, wired in parallel with the start button
    • D. A timer that holds the coil for a set time
    Show answer

    Answer: B. A normally open auxiliary contact of the contactor, wired in parallel with the start button

    The contactor's own auxiliary contact closes when it pulls in and bypasses the start button. This is the seal-in, or holding, contact. Pressing stop breaks the circuit and drops it out.

    Practice it: Three-wire motor starter lab →

  5. Question 5 · Motors

    Where is the overload relay's normally closed contact wired in a typical motor starter?

    • A. In series with the motor leads
    • B. In parallel with the start button
    • C. In series with the contactor coil in the control circuit
    • D. Across the control transformer secondary
    Show answer

    Answer: C. In series with the contactor coil in the control circuit

    The overload senses motor current in the power circuit, but its NC contact sits in the control circuit in series with the coil. When it trips, the contact opens, the coil drops out and the motor stops.

    Practice it: Tripped overload fault lab →

  6. Question 6 · Motors

    How do you reverse the direction of a three-phase induction motor?

    • A. Swap all three line leads
    • B. Swap any two of the three line leads
    • C. Reverse the polarity of the control voltage
    • D. Lower the supply frequency
    Show answer

    Answer: B. Swap any two of the three line leads

    Swapping any two phases reverses the rotating magnetic field. A reversing starter does this with two contactors wired to swap two phases.

    Practice it: Forward/reverse starter lab →

  7. Question 7 · Control circuits

    In a forward/reverse starter, why is a normally closed contact of the reverse contactor wired in series with the forward coil?

    • A. To make the motor start faster
    • B. To stop both contactors from closing at the same time
    • C. To protect the motor from overload
    • D. To hold the forward contactor in
    Show answer

    Answer: B. To stop both contactors from closing at the same time

    If both contactors closed together, two phases would be shorted. Each coil is interlocked through a normally closed contact of the other contactor, so only one can be energized.

    Practice it: Forward/reverse PLC scenario →

  8. Question 8 · Test instruments

    You want to check whether a fuse is blown. The circuit is locked out and the fuse is removed. Which meter setting do you use?

    • A. AC volts
    • B. DC amps
    • C. Continuity or ohms
    • D. Frequency
    Show answer

    Answer: C. Continuity or ohms

    With the power off, a good fuse shows continuity (near zero ohms) and a blown fuse shows open. Voltage tests need the circuit energized, and an amps setting is never used across a component.

    Practice it: Blown control fuse fault lab →

  9. Question 9 · Troubleshooting

    A 120 VAC contactor coil will not pull in. You read 120 V from terminal A1 to neutral and 0 V across A1 and A2. What is the most likely fault?

    • A. The coil is shorted
    • B. There is no control voltage at the coil
    • C. The return (neutral) wire from A2 is open
    • D. The overload has tripped upstream of A1
    Show answer

    Answer: C. The return (neutral) wire from A2 is open

    Voltage is present at A1, so supply and upstream contacts are fine. With an open return, no current flows, so there is no voltage drop across the coil and A2 floats up to the same potential as A1. Check the wire from A2 back to neutral.

    Practice it: Broken coil return wire fault lab →

  10. Question 10 · Test instruments

    Why must you never connect a meter set to measure current directly across a voltage source?

    • A. The reading will be in the wrong units
    • B. The meter has very low resistance on the current setting, so it creates a short circuit
    • C. The meter will read zero
    • D. It drains the meter battery
    Show answer

    Answer: B. The meter has very low resistance on the current setting, so it creates a short circuit

    On the current setting the meter is a low-resistance path. Across a voltage source it becomes a short, which can blow the meter fuse, damage the meter or cause an arc flash. Current is measured in series, or with a clamp meter.

    Practice it: Multimeter simulator →

  11. Question 11 · PLCs

    A normally closed stop button is wired to a PLC input. Nobody is pressing it. What state is the input in?

    • A. ON (1)
    • B. OFF (0)
    • C. It alternates every scan
    • D. It depends on the output
    Show answer

    Answer: A. ON (1)

    A normally closed button passes voltage until it is pressed, so the input is ON. In the program you examine it with a normally open instruction (XIC in Allen-Bradley), so the rung stays true until someone presses stop or a wire breaks.

    Practice it: Motor start/stop PLC scenario →

  12. Question 12 · Ladder logic

    A rung has Start (normally open) in parallel with a Motor_Run contact, then Stop (examined as closed), then the Motor_Run output coil. The operator presses and releases Start. What happens?

    • A. The motor runs only while Start is held
    • B. The motor starts and keeps running until Stop opens
    • C. Nothing; the rung can never be true
    • D. The motor runs for one scan and stops
    Show answer

    Answer: B. The motor starts and keeps running until Stop opens

    This is the PLC version of the seal-in circuit. Once Motor_Run turns on, its own contact holds the rung true after Start is released. Opening Stop breaks the rung.

    Practice it: Allen-Bradley ladder lessons →

  13. Question 13 · PLCs

    A TON timer has a 5-second preset. Its rung goes true for 3 seconds, then false. What happens?

    • A. The done bit turns on after 5 seconds anyway
    • B. The accumulator holds at 3 seconds
    • C. The done bit never turns on and the accumulator resets to 0
    • D. The timer counts down from 5
    Show answer

    Answer: C. The done bit never turns on and the accumulator resets to 0

    An on-delay timer only times while its rung is true. If the rung goes false before the preset, the accumulator resets and the done bit stays off. A retentive timer (RTO) is the one that would hold 3 seconds.

    Practice it: PLC timers practice →

  14. Question 14 · PLCs

    A PNP (sourcing) proximity sensor is being wired to a 24 V DC PLC input card. What kind of input does it need?

    • A. A sourcing input
    • B. A sinking input
    • C. An analog input
    • D. A relay output
    Show answer

    Answer: B. A sinking input

    A PNP sensor sources current out to the load. The input must sink it, with the card's common tied to 0 V. An NPN sensor is the opposite and needs a sourcing input.

    Practice it: NPN/PNP sensor wiring lab →

  15. Question 15 · Instrumentation

    A pressure transmitter outputs 4–20 mA for 0–100 psi. It reads 12 mA. What is the pressure?

    • A. 12 psi
    • B. 50 psi
    • C. 60 psi
    • D. 75 psi
    Show answer

    Answer: B. 50 psi

    The span is 16 mA (20 − 4). 12 mA is 8 mA above 4 mA, which is half the span, so 50 psi. A reading near 0 mA usually means an open loop, not zero pressure.

    Practice it: 4–20 mA analog input lab →

Practice the skills, not just the questions

Multiple-choice questions test whether you understand a circuit. The fastest way to build that understanding is to wire it, break it and fix it. These labs run in your browser.

Motor control circuits

Three-wire starters, interlocks, forward/reverse and overloads.

Fault-finding

19 fault labs: open returns, blown fuses, tripped overloads, sensor wiring.

Test instruments

Voltage, resistance and continuity readings, with the safe setting for each.

PLCs and ladder logic

Inputs, outputs, seal-ins, timers and counters, plus troubleshooting a running program.

Free to start: 32 practice scenarios, starter wiring and fault labs, and the first 6 ladder lessons, with no card needed. Moving from the tools into PLCs? Read PLC training for electricians.

How to prepare in two weeks

  1. Ask the employer which test you will take and whether it covers mechanical, electrical, PLC or all three.
  2. Answer the 15 questions above cold. Note every topic you missed.
  3. For each missed topic, do the linked lab until you can explain the answer out loud.
  4. Review control schematics: seal-ins, interlocks, overloads, control transformers and fuses.
  5. Practice meter work safely: what to measure, where, and on which setting.
  6. If PLCs are on the test, build a start/stop rung and a timer rung and predict what they do before you run them.
Questions

Ramsay test: common questions.

Ramsay tests are written skills tests from Ramsay Corporation, an employment-testing company founded in 1973. Employers use them to hire and promote maintenance and craft workers. Most are multiple choice, given on paper or online, and Ramsay requires a live proctor. "The Ramsay test" usually means the MultiCrafTest for maintenance roles or the ElecTest for electrical roles.

Sources

Test descriptions checked on 25 October 2026. Practice questions are original to this site.

  1. Ramsay Corporation 2026 catalog (PDF)Company background, test formats, item counts, categories and proctoring.
  2. Ramsay Corporation, ElecTest product pageElecTest item count and categories.
  3. Ramsay Corporation, MultiCrafTest product pageMultiCrafTest item count and categories.
  4. Ramsay Corporation, PLC Test product pagePLC Test item count and categories.
  5. Ramsay Corporation FAQNo prep materials sold or sanctioned; cut scores set per employer.