Prove the tester
Before relying on a dead reading, prove the instrument on a known source, test the target circuit, then re-prove the instrument. Follow the site procedure and equipment category limits.
Choose the mode, range and probe placement, then grade the measurement plan.
First challenge
Measure a 24 VDC control supply
Configure the meter and probes for a voltage measurement across a control supply.
Reusable lab resources
Measurement-plan templateCSVInteractive measurement lab
Configure the meter and probes for a voltage measurement across a control supply.
The backend calculates the expected result and returns individual checks, a score and reproducible evidence. Client-supplied scores are ignored.
Your run is free. Keep the evidence when it matters.
Create an account only when you want saved attempts, projects, sharing and progress.
Training outcomes
Each run teaches a transferable industrial workflow and produces evidence you can inspect, repeat and discuss.
Choose voltage, resistance, continuity and current modes for the job.
Place a voltage meter in parallel and recognise why current mode is hazardous across a supply.
Apply isolate, lock out and prove-dead logic before resistance or continuity tests.
Continue into scored electrical troubleshooting scenarios with a virtual meter.
Field method
Before relying on a dead reading, prove the instrument on a known source, test the target circuit, then re-prove the instrument. Follow the site procedure and equipment category limits.
A voltmeter compares potential between two points. Current mode has a low-resistance path and can cause a short if placed directly across a supply.
Resistance and continuity modes inject their own test signal. De-energise, isolate and prove dead before using them.
Continue from a single exercise to a complete training record.
Guided scenarios, saved progress, fault diagnosis and instructor reporting are built into the main platform.
Technical practice library
Each reference explains a distinct industrial task and links back to an exact grader preset with server-owned acceptance evidence.
24 VDC control power supply
Choose the correct multimeter mode, probe placement, circuit state and range for a live 24 VDC control supply.
Control transformer secondary
Build a safe multimeter plan for a 120 VAC transformer secondary using AC voltage mode and a suitable range.
230 VAC contactor coil
Plan a 230 VAC coil-voltage measurement that separates a missing command from a mechanically failed contactor.
Removed control fuse
Choose isolation, prove-dead, continuity mode and across-component placement before testing a removed control fuse.
Isolated contactor coil
Plan a de-energised resistance check across an isolated contactor coil and recognise open-circuit evidence.
4–20 mA transmitter loop
Plan a controlled loop-current measurement using the fused mA input, current mode and series placement.
Three-wire proximity sensor
Select a safe voltage measurement between the brown and blue conductors before diagnosing the sensor output.
Disconnected three-phase motor
Plan an isolated phase-to-phase resistance comparison that looks for balance rather than one universal ohm value.