PLC Simulator

For instructors

PLC certification practice: the free labs against NIMS and PMMI topics

If your course lines up with a published PLC standard, this page shows which of its topics the 12 free beginner labs give practice on, and which they do not. Independent: not affiliated with or endorsed by NIMS or PMMI. Both sources last checked 20 November 2026.

PMMI: Programmable Logic Controllers (PLCs) 1

PMMI's page lists this test as 100 questions with a 70 percent pass mark, priced at $125 when we checked. It names eleven topic areas, which are the left column below.

PMMI PLCs 1 topic areas and the free labs that practise them
PMMI topic areaFree labs hereHow far it goes
Operation of a PLCStudents run one program and see the output follow the input. Pair it with a short talk on the scan cycle.
Memory Organization and AddressingNo labNo lab: tags are named, so addressing is not drilled. Use your own controller's memory map.
Discrete I/O InterfacingNo labEach lab has a discrete input and output table, but students do not wire or choose modules. That is bench work.
Function and Use of Monitoring DevicesNo labNo lab.
Basic PLC Logic InstructionsContacts, coils, series and parallel logic, a normally closed stop contact, and latching with SET/RESET.
PLC Timer and Counter Instructions
  • Lab 8. Delayed-on light (TON)
    • Hold SWITCH 2200 ms → LIGHT on
    • Hold SWITCH 1700 ms → LIGHT stays off
    • Release SWITCH early → LIGHT stays off
  • Lab 9. Conveyor with auto stop
    • After 3.5 s → MOTOR off (timer auto-shut)
    • Pulse START → MOTOR on
    • Mid-cycle (2.6 s) → MOTOR still on
  • Lab 10. Count to five (CTU)
    • Five BOX_EYE pulses → CARTON_FULL on
    • Four BOX_EYE pulses → CARTON_FULL still off
    • CNT_RESET after a full carton → lamp off, next carton counts from zero
  • Lab 11. Count five boxes and stop (CTU)
    • Tap START → MOTOR on, CARTON_FULL off
    • Five BOX_EYE pulses → CARTON_FULL on, MOTOR off
    • Three BOX_EYE pulses → MOTOR still on, CARTON_FULL off
    • CNT_RESET after full carton → lamp off, conveyor can restart
On-delay timer and count-up counter only. Off-delay, retentive and count-down instructions have no lab.
Basic PLC Motor Control Applications
  • Motor lab 1. Three ways to stop
    • START → MOTOR and RUN_LAMP on
    • STOP → MOTOR and RUN_LAMP off
    • ESTOP stops the motor, and it stays off after ESTOP clears
    • THERMAL_OL stops the motor, and it stays off after the overload clears
    • START does nothing while ESTOP is active
    • START does nothing while THERMAL_OL is active
  • Motor lab 2. Remember the trip
    • ESTOP while running → motor off, FAULT_LAMP on
    • ESTOP released → FAULT_LAMP stays on, motor stays off
    • RESET while THERMAL_OL is still active → fault stays on
    • Cause cleared, then RESET → FAULT_LAMP off, motor still off
    • START while the fault is latched → motor stays off
    • After a reset, START runs the motor again
    • RESET while ESTOP is still active → fault stays on
  • Motor lab 3. Motor Start/Stop & Fault Monitoring
    • Start energises contactor and run lamp, stop drops both
    • Start pulse seals in via latch
    • E-stop latches fault, clears only via stop-pb
    • Thermal overload latches fault, needs reset + stop-pb to clear
    • Stuck auxiliary feedback latches fault
Stop sources, a latched fault with a reset, and a start/stop with fault monitoring.
Basic PLC Sequencing Applications
  • Lab 9. Conveyor with auto stop
    • After 3.5 s → MOTOR off (timer auto-shut)
    • Pulse START → MOTOR on
    • Mid-cycle (2.6 s) → MOTOR still on
  • Lab 12. Carton line (mini-project)
    • START → MOTOR off for 0.5 s, then on after the delay
    • STOP while running → MOTOR off and stays off
    • STOP during the 2 s wait → MOTOR never starts
    • Five boxes → CARTON_FULL on, MOTOR off
    • Three boxes → MOTOR still on, CARTON_FULL off
    • CNT_RESET after a full carton → lamp off, START runs again
Timed steps only. No sequencer instruction.
Basic PLC Machine Application
  • Lab 12. Carton line (mini-project)
    • START → MOTOR off for 0.5 s, then on after the delay
    • STOP while running → MOTOR off and stays off
    • STOP during the 2 s wait → MOTOR never starts
    • Five boxes → CARTON_FULL on, MOTOR off
    • Three boxes → MOTOR still on, CARTON_FULL off
    • CNT_RESET after a full carton → lamp off, START runs again
A small conveyor project that combines a start/stop, a delay, a counter and a stop.
Troubleshooting PLC Based SystemsNo labNo lab among the 12 free beginner labs.
Troubleshooting PLC Hardware and SoftwareNo labNo lab. Hardware faults need hardware.

NIMS: Duty Area 6, Electronic Control Systems

The NIMS duties and standards for Industrial Maintenance Technicians (Mechatronics Technicians), Level I, has PLC duties in Duty Area 6: 6.06 transfer programs to a controller, 6.07 create a basic ladder-style program, 6.08 install and test basic PLC components and 6.09 troubleshooting. Only 6.07 is mostly about programming, so it is the one the labs map to.

NIMS Level I Duty Area 6 PLC duties and the free labs that practise them
NIMS dutyFree labs hereHow far it goes
6.06 Transfer programs to a programmable controller using a PCNo labNo lab. This site cannot connect to a controller, so downloading and going online are bench work with your own software.
6.07 Interpret programs that use contacts, timers, counters and coilsLabs 1 to 7 are contacts and coils, 8 and 9 timers, 10 to 12 counters. Students write the programs rather than only read them, which goes beyond the standard's wording. No lab for subroutines, conditional commands or math.
6.07 Interpret programs that control and sequence electric motors
  • Motor lab 1. Three ways to stop
    • START → MOTOR and RUN_LAMP on
    • STOP → MOTOR and RUN_LAMP off
    • ESTOP stops the motor, and it stays off after ESTOP clears
    • THERMAL_OL stops the motor, and it stays off after the overload clears
    • START does nothing while ESTOP is active
    • START does nothing while THERMAL_OL is active
  • Motor lab 2. Remember the trip
    • ESTOP while running → motor off, FAULT_LAMP on
    • ESTOP released → FAULT_LAMP stays on, motor stays off
    • RESET while THERMAL_OL is still active → fault stays on
    • Cause cleared, then RESET → FAULT_LAMP off, motor still off
    • START while the fault is latched → motor stays off
    • After a reset, START runs the motor again
    • RESET while ESTOP is still active → fault stays on
  • Motor lab 3. Motor Start/Stop & Fault Monitoring
    • Start energises contactor and run lamp, stop drops both
    • Start pulse seals in via latch
    • E-stop latches fault, clears only via stop-pb
    • Thermal overload latches fault, needs reset + stop-pb to clear
    • Stuck auxiliary feedback latches fault
Electric motor start/stop, stop sources and fault latching. No lab for fluid power.
6.07 Read an I/O diagram and describe how a PLC addresses I/ONo labEach lab opens with a table of inputs and outputs that students read before programming, but addressing schemes and analog cards are not practised. Cover those on your trainer.
6.01 Safety, 6.08 Install and test PLC components, 6.09 TroubleshootingNo labNo lab. These are hands-on duties.

Using this if you teach toward PMMI PLCs 1

Assign the labs in order for the logic, timer, counter and motor topics. Then plan other time for the 5 of 11 topic areas that have no lab here: Memory Organization and Addressing; Discrete I/O Interfacing; Function and Use of Monitoring Devices; Troubleshooting PLC Based Systems; Troubleshooting PLC Hardware and Software. For those, use your textbook, your trainers and the credential body's own study material.

What this does not cover

  • Hands-on work: wiring, installing modules, connecting to a controller and downloading a program. A browser cannot teach these.
  • Brand-specific software: your controller's programming package, its addressing and its instruction names beyond the ladder basics.
  • The credential tests themselves: we have no practice exam for PMMI or NIMS and are not an approved resource of either.
  • Qualification: the paid tracks give a completion certificate we issue. It is not accredited and is not a PMMI or NIMS credential.

See also the textbook companion, the course outline and training equipment for where hardware fits. Questions: paul@plcsimulationsoftware.com.

FAQ

Credential practice questions.

They give practice on some of the PLC topics those credentials name. They are not a preparation course approved by either body, we have no practice exam for either, and passing the labs does not mean a student will pass a credential test. The tables show which topics have a lab and which do not.

Sources

Both checked on 20 November 2026. Written by Paul.

  1. NIMS, Duties and Standards for Industrial Maintenance Technicians (Mechatronics Technicians), Level IDuty Area 6, Electronic Control Systems: duty titles 6.01 to 6.09 and the performance standard for 6.07, Create a basic PLC ladder-style program.
  2. PMMI, Programmable Logic Controllers (PLCs) 1The credential title, 100 questions, a 70 percent pass mark, a $125 test price and the eleven topic areas.

This page is an independent learning resource. It is not affiliated with or endorsed by PMMI or by the National Institute for Metalworking Skills (NIMS). Names and credential titles belong to their owners; the topic descriptions are ours.