Briefing

A VFD (Variable Frequency Drive) requires: DRIVE_ENABLE → wait for DRIVE_READY feedback → then start DRIVE_RUN. Implement the handshake using a TON debounce.

Objectives

  • Assert DRIVE_ENABLE when START_CMD is given
  • Wait for DRIVE_READY feedback (50ms minimum)
  • Assert DRIVE_RUN after DRIVE_READY held for 50ms

Hints

  • TON for 50ms debounce on DRIVE_READY
  • DRIVE_RUN := DRIVE_ENABLE AND TON_1.Q

I/O Table

Inputs

START_CMD

Operator start command

BOOL · %I0.0

DRIVE_READY

Drive ready feedback

BOOL · %I0.1

Outputs

DRIVE_ENABLE

Drive enable signal

BOOL · %Q0.0

DRIVE_RUN

Drive run signal

BOOL · %Q0.1

Your program will be tested against:

All test cases run automatically when you submit. Assertions are hidden until you pass.

  1. #1Enable on start

    Enable on start

  2. #2Run after ready + 50ms

    Run after ready + 50ms

Ready to build this?

Sign up free — no credit card required. This scenario requires the Pro plan.

Sign up to play this scenario →

Already have an account? Log in

Job-readiness and assessment field guide

CCST practical 026 controller-output assessment: readiness checklist

Direct answer

The candidate can separate algorithm demand, mode, limits, output hardware, interface, actuator and feedback and prove the first failed boundary.

Written for controls-technician candidates diagnosing a correct-looking controller value that does not produce the expected field response.

a supervised controls-technician practical assessment bench with representative instruments, motor controls and retained diagnostic evidence while studying controller-output verification, final-element permission and independent feedback
System map / 02

NODE 01observable

Role scope

Control demand, automatic or manual mode, output limits, permissives, final owner, hardware channel, signal, interface device, actuator and independent response.

NODE 02observable

Skills map

Algorithm result through mode and limit selection, output tag, module, wiring, interface, final element and measured process or position feedback.

NODE 03observable

Core exercise

A bounded authorized demand reaches the correct channel and produces coherent signal, actuator and process evidence.

NODE 04observable

Stretch case

Manual ownership, clamped output, force, wrong channel, open loop, failed relay, air loss, sticky actuator, bad feedback and restart.

NODE 05observable

Troubleshooting

An algorithm, mode, limit, permission, owner, module, loop, interface, actuator or feedback mismatch.

NODE 06observable

Portfolio evidence

The physical test completed with approved bypass, process and safety controls and current equipment documentation.

Answer surface / 07

Why can a PLC output value change without field movement?

Mode selection, clamps, interlocks, forces, module state, external power, wiring, interface devices or the actuator can break the path after the calculated value.

Should a technician force an output to test equipment?

Only under a formally authorized and risk-controlled procedure; safer boundary tests and simulation should be used where possible.